CleanMax - Wellbore Cleanup

The first step to ensure an optimum completion is to remove leftover drilling fluid residue and casing debris. This requires that the drilling mud be changed out with solids-free completion fluids. Completion fluid displacement involves multiple fluids sequenced in circulation. Varying flow rates, flow paths, circulation subs, multiple stages and possible HTHP conditions make it increasingly difficult to determine pump pressures and bottomhole ECDs. Despite these significant challenges, however, detailed planning of the wellbore cleanup operations can help ensure both job success and well productivity. PVI’s CleanMax, the next generation of wellbore cleanup software, enables both service companies and operators to optimize their completion displacement operations. It is designed to help minimize spacer interfacing and reduce rig time, pill volumes and filtration costs, ultimately resulting in safer operations and cleaner wellbores. Our advanced version, CleanMax+, is designed for deepwater operations, which involve displacements using the choke, kill, and boost lines and a combination of various steps.FEATURES
  • Up to 16 operation stages for land wells
  • Free-fall/back-fill (U-tubing) calculation
  • ECDs/pressures at various depths vs. time
  • Up to 12 fluids for each stage
  • Circulating temperature prediction
  • Fluid compressibility
  • Pressure and temperature dependent rheology
  • Effects of pipe standoff on hydraulics
  • Circulation sub and gravel pack
  • Coiled tubing operation
  • Oil field, SI, and customized units
Rating
Visits
1,228
Redirects
303
Don't Miss Out! Get the Best Deal on this Software - Email Us Now!

.