PlugPRO - Cement Plug Placement *Coming Soon*

  • 1284.jpg
PVI is currently developing PlugPRO, a cement plug placement model that calculates under-displacement volumes and optimizes fluid volumes to balance slurry and spacer levels after pull out of the hole (POOH). In addition, PlugPRO also models the displacement hydraulics of fluids. We look forward to sharing PlugPRO with you and will keep you posted on our release date!FEATURES
  • Balance slurry and/or spacer levels
  • Option of under-displacement volume
  • Customized pumping schedule
  • Fluid mixing during pull out of the hole (POOH)
  • Circulating temperature
  • CEDs/pressures at various depth vs. time
  • Snaptshot of hydrostatic/total pressure profile
  • Results automatically exported into Microsoft Word® with output options
  • The temperature at the leading edge of the selected fluid vs. time
Rating
Visits
1,615
Redirects
504
Don't Miss Out! Get the Best Deal on this Software - Email Us Now!

.